Starting October 7, repair work on the Lueg Bridge will address road surface damage. During this period, which is expected to last three to four weeks, traffic will be reduced to a single lane.
From January 2025, traffic on the Lueg Bridge will temporarily be limited to one lane per direction to allow for essential maintenance work. In case of heavy traffic, an additional lane can be opened to ensure smooth traffic flow. Recent tests have confirmed that this flexible solution is both safe and effective, minimizing disruptions for drivers.